Deli Serdang, October 19th
As a form of closing the use of groundwater in the Medan Industrial Area as well as meeting the needs of clean water for all tenants according to the direction of the Corruption Eradication Commission of the Republic of Indonesia and the Governor of North Sumatra some time ago, on Wednesday (19/10), PT KIM carried out a groundbreaking for the construction of a Water Management Installation Clean and Clean Water Distribution Network Phase 2 at KIM Block 3. The groundbreaking was carried out by Mr. Daly Mulyana, as Plt. President Director, Mr. M. Hita Tunggal, as Director of Development & Operations, and the Board of Directors of PT Dain Celicani Cemerlang Mr. David Suryabara (President Director), Mr. Donny Suleiman (Director of Operations), and Mr. M. Sachri (Director of Engineering).
The construction of the Clean Water Management Installation and Clean Water Distribution Network Phase 2 is an addition of approximately 250,000 m3 of clean water capacity from the first phase installation of approximately 250,000 m3 so that a total of approximately 500,000 m3 of clean water will be supplied to all tenants in the Industrial Estate Medan.
Construction of Phase 2 of Clean Water Management Installation and Clean Water Distribution Network will be completed and operational in March 2023.
On this occasion also the signing of the Second Amendment to the Cooperation Agreement on the Supply of Clean Water in the Medan Industrial Estate between PT KIM and PT DCC.